Spacedust Posted March 14, 2004 Report Posted March 14, 2004 I'm a couple of hours into roam game, for some reason the radine and plutonium levels have started to drop really fast after loading it from a save and resnig started to die suddenly (whether he is eating the resources or not I don't know). I reloaded the save game and the crew stayed at 100% this time, but the resources still drop REALLY fast (I went from 300 radine to 0 and reactor shutdown in about 15 mins. Is this a bug or is something else happening I'm not seeing?
Reno Posted March 14, 2004 Report Posted March 14, 2004 In the early game, your ships engine is a real radine hog, and I believe your shields are too. Actually, all the beginning kit on your ship is rather hungry...just try to upgrade as soon as you can.
Spacedust Posted March 14, 2004 Author Report Posted March 14, 2004 I've been looking through station supplies, but I havn't been able to find any parts also what do the abriviations mean under weapons (e.g. FPW, ATA, STS etc)? I don't think it says in the manual. And how do you feed the crew?
Marvin Posted March 14, 2004 Report Posted March 14, 2004 quote:Originally posted by Spacedust: ...what do the abriviations mean under weapons (e.g. FPW, ATA, STS etc)? I don't think it says in the manual. Check the Appendix ... it'll tell you about your weapons, your assets, your crew, etc. quote:And how do you feed the crew? If they don't have the AI to feed themselves, send them to MediBay for an I-V.
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now